Baseline. Assist.Bounded. Repeat.

Every Smelteon engagement produces the same artefact: a defensible before-and-after on first-pass yield, scrap, porosity and melt energy, measured against a baseline captured in shadow mode.

[ASPIRATIONAL / PLACEHOLDER] Smelteon is pre-revenue. The engagements below are modelled design-partner scenarios that describe the measurement method we commit to, not audited customer results. Real, named case studies will replace them once design partners approve publication.

3Modelled engagements
1Wedge cell each
100%Start in shadow mode

Built with foundries and die casters melting iron, steel, aluminium, magnesium and copper

Ironhaus GroupMeridian CastingsVulcan DuctileAurora Light MetalsKestrel Die CastingNorthfield Foundry Co.

[PLACEHOLDER] Design-partner names are illustrative until first references are signed.

Pour control ona moving line.

01Misruns, cold shuts and two retiring pourers

A 180kt/yr ductile iron foundry running an automotive crankshaft programme. Pour consistency varied by shift, misrun and cold-shut scrap concentrated on one geometry, and two of three experienced pourers were within a year of retirement.

  • Wedge cell: robotic pour and fill control
  • Baseline captured over eight weeks in shadow mode
  • Ground truth: existing X-ray results and scrap tickets
  • Problem
  • Method
  • Measure

CT triage thatkeeps up withthe line.

01Inspection is the bottleneck

A structural aluminium caster ramping an EV programme where CT inspection could not keep pace with output. Sampling left escape risk, and every reject destroyed hours of accumulated value.

  • Wedge cell: X-ray and CT porosity and inclusion detection
  • Escape risk on safety-relevant features
  • Rejects discovered after machining value added
  • Problem
  • Method
  • Measure

Holding the windowacross the charge.

01Heat-to-heat drift and energy cost

A multi-alloy foundry where scrap-charge variation drove chemistry drift and correction additions, melt energy dominated the plant's utility bill, and inoculation fade quietly changed metallurgy between pours.

  • Wedge cell: melt chemistry and temperature optimisation
  • Chemistry corrections logged but not modelled
  • Melt energy per tonne unmanaged at the heat level
  • Problem
  • Method
  • Measure

How we provea number moved.

Every engagement uses the same measurement discipline, agreed in writing before the pilot starts.

StageWhat happensWho signs
BaselineShadow-mode instrumentation over a representative production period using the plant's own records as ground truthPlant director, metallurgist
Golden setAgent predictions scored against the plant's inspection results for that alloy and geometry familyMetallurgist, quality engineer
AssistRecommendations approved by an engineer; outcomes graded by inspection; corrections captured as labelsMetallurgist
ReportBaseline vs. improved KPI report on yield, scrap, porosity, melt energy and taktPlant director, finance
Safety reviewProcess windows, rollback paths, escalation rules and robot envelopes reviewedQuality, EHS
BoundedLow-risk cells graduate to adaptive control with exceptions escalatingPlant director, EHS

What you keep,whatever happens next.

Baseline vs. improved KPI report

A defensible before-and-after on first-pass yield, scrap rate, porosity rate, melt energy and takt at the wedge cell.

Integration reference

A documented, working integration with your furnace, molding, pouring, inspection and MES systems — including failure modes.

Golden dataset

A labelled golden set for your alloy and geometry family, built from your own inspection ground truth.

Audit evidence pack

The immutable action, approval and outcome log, tied to casting genealogy, exportable for IATF 16949 or AS9100 review.

8 wks

Typical shadow-mode baseline period

3

Autonomy gates before write-back

1

Wedge cell per engagement

0

Results published without customer approval

The case studieswe are workingtoward.

As design partners graduate to assist and bounded modes, these are the studies we intend to publish — with their names on them, and their numbers.

In progress · design partner

Robotic pour control on an automotive crankshaft line

Misrun and cold-shut scrap, pour consistency across shifts and takt recovery on a moving green-sand line.

Pending

In progress · design partner

CT triage for EV structural megacastings

Detection accuracy against plant CT verdicts and value recovered before secondary machining operations.

Pending

Scoping

Melt energy and chemistry window on a multi-alloy plant

Chemistry-in-window rate, correction additions and kWh per tonne across scrap-charge variation.

Pending

Scoping

Robotic fettling and operator exposure reduction

Finishing consistency, rework rate and hours of hot, dusty manual exposure removed from the plant.

Pending

“We will publish a customer's number when the customer signs off on it, and not one quarter before.”

SmelteonDesign partner programme

Be the firstnamed study.

Design partners get preferential expansion terms in exchange for case-study rights once the numbers are in.